  • 1 . 68. (412) Heat can be transferred in cryotainers by
    conduction, convection, and radiation.
  • 2 . 28. (404) How many tanks are used with the Type IV hydrant system and how many gallons will each hold?
    4; 50,000.
  • 3 . 79. (414) Before issuing liquid oxygen/liquid nitrogen (LOX/LIN) to a receiving cryotainer, open the pressure build-up valve until the pressure gauge, in pounds per square inch (psi), indicates
    10 to 15 psi
  • 4 . 42. (406) On a fillstand equipped with the Scully Intellitrol® control system, how often are electrical pulses sent to the high-level sensor during a filling operation?
    30 times per second
  • 5 . 27. (404) What is the rated capacity in gallons per minute (gpm) of the pumps on the Type IV hydrant system?
    600 gpm
  • 6 . 22. (403) Which condition will cause the vibrating horn to sound on the Type III hydrant system?
    Engine generator fault
  • 7 . 80. (415) As a minimum, vacuum checks should be performed on cryotainers every
    180 days
  • 8 . 40. (406) During Type IV hydrant system operations, who is responsible for positioning the aircraft on the “hot pad?”
    Hot refueling supervisor.
  • 9 . 44. (406) Under normal conditions and as a minimum, how many hours must fuel in above ground tanks settle prior to transferring?
    8.
  • 10 . 56. (407) When performing a daily inspection of fixed hydrant system filter separators, you must inspect the vessel for ¾ to 1 inch markings that include all of the following information except
    date of last filter element change in the MMM/YY format